South Port New Zealand Limited
A resource consent hearing was held 12 & 13 April 2022.
Public notice is hereby given pursuant to S.95A of the Resource Management Act 1991 that the following application for resource consent has been received by Environment Southland.
The application (reference APP-20211362) is for the following activities at Bluff Harbour and Foveaux Strait off shore of Tiwai Peninsula:
South Port New Zealand Limited ("South Port") is applying to dredge and remove seabed materials to the following targeted depths as part of project ‘Kia Whakaū’:
- 9.7 m chart datum (CD) in the harbour entrance channel
- 10.7 m CD in the Island Harbour berth basins.
- 9.45 m CD in the swinging basin; and
The application is for the following resource consents to authorise proposed activities:
- Coastal Permit to dredge soft sediment from the swinging basin and from the Island Harbour berth basins 3, 4, 5, 6,7 and 8;
- Coastal Permit for the disturbance and removal of the seabed/rock through breaking, drilling, blasting and dredging of rock material from rock outcrops within the harbour entrance channel and from the margins of the channel; and
- Coastal Discharge Permit for the discharge of up to a maximum volume of 120,000m3 of soft sediment and 40,000m3 of rock is proposed to be deposited at two disposal sites located in Foveaux Strait offshore of Tiwai Peninsula. The soft sediment and the hard rock material is to be disposed seaward of Tiwai Peninsula.
South Port proposes to utilise existing consents (listed below) and supplement these with additional new permits associated with dredging soft sediment from the upper Bluff Harbour and drilling, blasting, breaking hard rock in the bed of the harbour and dredging/excavating that hard rock onto vessels. All dredged and excavated material will be deposited at two disposal sites located in Foveaux Strait offshore of Tiwai Peninsula.
South Port holds the following existing consents: (Note: This is for information purpose only and these existing consents are not part of the current process to be submitted on)
Existing consents:
- Deemed Coastal Permit under s.384(1)(c) of the RMA. This permit allows South Port to remove any blasted or fragmented rock that remains in the channel from the previous capital dredging campaigns in the 1970’s and 1980’s, up until its expiry on 30 September 2026.
- Coastal permit 201285-V2 that consents the maintenance dredging and deposition of a maximum of 20,000m3 of soft sediment per annum with an annual average volume of spoil not exceeding 12,000m3 over the term of the permit. The permit expires on 2 December 2037.
For the purpose of the consent application, South Port has referred to the sought consents, as “Capital Dredging” and all other existing consented works as “Maintenance Dredging”. The term of consents being sought is 10 years. The programme of physical works is 8 months, albeit 24 months from commencement has been sought to allow for any contingency. The South Port application outlines the potential to give effect to the Deemed Coastal Permit, the Maintenance Dredging Consent (Coastal Permit 201285-V2), and the sought consents to achieve the depths required. The sought consents seek permission to excavate to the targeted depths in case the work has to be carried out after the expiry of the Deemed Coastal Permit.
Purpose: Capital Dredging
Location: Part of the seabed within Bluff Harbour and Foveaux Strait south and east of Tiwai Point:
Centre of berth basins: | Disposal site (sediment): | Disposal site (rock): |
Berths 3 & 4 4829504N 1242725E
Berth 5 4829611N 1242626E | 4829176N 1246514E
4829196N 1246312E | 4828318N 1248754E
4828125N 1248607E |
Centre of swinging basin: | Centre of harbour entrance channel: | |
4829468N 1243281E | 4828749N 1244359E | Note: See map below. |
Legal Description of Property: Crown land comprising seabed.
Address for Service: Frank O’Boyle, South Port New Zealand Ltd, PO Box 1, Bluff 9842. foboyle@southport.co.nz
Full details of this application are also available for inspection at Environment Southland, corner of Price Street and North Road, Waikiwi, Invercargill during working hours (8.00 am to 5.00 pm). Enquiries may be directed to Hamish Peacock by phone to (03) 345 7116 or by email to Hamish.Peacock@pdp.co.nz.
Submissions closed on the above application at 5 pm 31 January 2022.
Application Documents and Further Information
- 1. Application for Resource Consents - Bluff Harbour Capital Dredging - APP-20211362.pdf (PDF, 49.9MB)
- 2. Request for Further Information s92.1 - APP-20211362.pdf (PDF, 421.4KB)
- 3. Table of s92 Requests & Actions- 30-11-2021.pdf (PDF, 390.2KB)
- 4. Bluff Harbour dredging Program Rev5.pdf (PDF, 688.6KB)
- 5.Further info response s92(1) - Risk Assessment Matrix - 4-11-2021.pdf (PDF, 602.1KB)
- 6. Map of proposed Bluff Harbour dredging works.jpg (1.2MB)
s95-95G Notification Documents
Section 42A Officer Hearing Report and Appendices
Applicant Hearing Evidence
- 00 Statement of evidence of Nigel Gear - South Port CEO (PDF, 765.9KB)
- 01 Statement of evidence of Frank O'Boyle - Infrastructure and Environmental Manager (PDF, 1.4MB)
- 02 Statement of evidence of Gary Teear - Coastal Processes and Engineering (PDF, 1.5MB)
- 03 Statement of evidence of Bryony Miller - Marine ecology (PDF, 2.6MB)
- 04 Statement of evidence of Dr Matt Pine - Underwater acoustics (PDF, 171.7KB)
- 05 Statement of evidence of Jon Styles - Airborne acoustics (PDF, 634.7KB)
- 06 Statement of evidence of Simon Childerhouse - Marine mammals (PDF, 2.9MB)
- 07 Statement of evidence of Brent Stephenson - Avifauna (PDF, 206.4KB)
- 08 Statement of evidence of Mike Moore - Landscape (PDF, 290.8KB)
- 08A Graphic supplement to evidence of Mike Moore (PDF, 2.6MB)
- 09 Statement of evidence of Simon Beale - Planning (PDF, 1.2MB)
- 10 Statement of evidence of James Stewart - Geology (PDF, 190.2KB)
- 10A Appendices A and B to evidence of James Stewart - Site Plans (PDF, 13.1MB)
- 10B Appendix C to evidence of James Stewart - UCS Test Results by CT (PDF, 414.1KB)
Supplementary Applicant Evidence
- Supplementary Applicant Hearing Attachment 1 to Evidence of Bryony Miller Turbidity tiers technical memo - 8 July 2022.pdf (PDF, 2.1MB)
- Supplementary Applicant Hearing Attachment 1 to Evidence of Simon Beale Proposed Conditions - 27 June 2022 HP review comments - 8 July 2022.pdf (PDF, 2.8MB)
- Supplementary Applicant Hearing Attachment 2 to Evidence of Simon Beale Final Conditions 7 July 2022 - 8 July 2022.pdf (PDF, 5.1MB)
- Supplementary Applicant Hearing Evidence of Bryony Miller - 8 July 2022.pdf (PDF, 657.5KB)
- Supplementary Applicant Hearing Evidence of Simon Beale - 8 July 2022.pdf (PDF, 117.3KB)
- Supplementary Applicant Hearing Evidence of Simon Childerhouse - 8 July 2022.pdf (PDF, 125.1KB)